Essential safety measures by state and territory: the annual statement, who signs it and where it goes

In 2025, Cladding Safety Victoria surveyed 80 Class 2 apartment buildings whose owners corporations volunteered from its cladding rectification program. Detection, warning and water based systems in common areas were all working on the day. Yet not one building had a complete set of maintenance documents, only 7 per cent could show milestone testing had been done, and 18 per cent of owners could not produce their latest annual essential safety measures report when asked. The core systems worked on the day. The evidence that they would keep working did not.

By Arbab Shah, asset and facilities manager. A practitioner's guide, not legal advice. The legal points below were checked against the instruments and regulator guidance named, as published in October 2026. Check the current instrument, and your building's fire safety schedule, occupancy permit or schedule of maintenance, before you rely on specifics.

That gap is what this guide is about. Every Australian state and territory expects a building's fire and life safety measures to be kept working, and each asks for the proof in a different shape. NSW wants a statement lodged with council. Victoria wants a report signed by the owner and available at the building within 24 hours of a request. Queensland wants a copy of the occupier statement sent to the Queensland Fire Department's Commissioner, South Australia a verification sent to council. In Western Australia, Tasmania, the ACT and the Northern Territory, the main instruments ask for no annual statement at all, only records that stand up when someone asks for them.

Eight jurisdictions, one table

The table scrolls sideways to show every column.

Essential safety measures by jurisdiction, as at October 2026
JurisdictionMain instrumentAnnual documentWho signs or issues itWhere it goesMaintenance basis
NSWEP&A (Development Certification and Fire Safety) Regulation 2021, Parts 10 and 12Annual fire safety statement, plus supplementary statements for critical measuresThe owner or an authorised agent, after an accredited practitioner (fire safety) has assessed each measure within the previous 3 monthsCouncil, with a copy and the fire safety schedule to Fire and Rescue NSW, and displayed in the buildingAS 1851-2012 for the activities it covers, from 13 February 2026, unless an approved performance solution covers them. Records on site for 7 years
VICBuilding Regulations 2018, Part 15Annual essential safety measures report (AESMR)The owner signs (reg 224(b))Not lodged. Made available for inspection at the building within 24 hours of a request from the municipal building surveyor or chief officerAs set in the occupancy permit or maintenance determination. AS 1851-2012 accepted where these name AS 1851-2005 or earlier
QLDFire Services Act 1990, s 146M, Building Fire Safety Regulation 2008, Part 5, and QDC MP6.1Occupier statement, at the intervals in QDC MP6.1. The Queensland Fire Department expects one each yearThe occupier, or the owner where there is no occupierCopy to the Commissioner within 10 business days, and kept with the maintenance records for 2 yearsIntervals in QDC MP6.1, work by an appropriately qualified person
SAPlanning, Development and Infrastructure (General) Regulations 2017, reg 94Annual verification of essential safety provisions (Form 3, the ESP maintenance certificate)The owner gives it to council. Form 3 is signed by the owner or the owner's delegate and by each person who carried out the maintenanceCouncil, within 60 business days after the end of each calendar yearAnnual maintenance and testing to the relevant Ministerial building standard
WABuilding Regulations 2012, reg 48ANoneNo statement. The owner of an existing Class 2 to 9 building holds the dutyNothing is lodgedMeasures must be capable of performing to the building standards that applied when each part was approved or built
TASBuilding Act 2016, Part 14, and Building Regulations 2016, Part 7None in the Act or Regulations. An approved schedule of maintenance insteadNo statement. The responsible owner, including a body corporate, holds the dutyRecords kept 10 years away from the building, with a copy on the premises, and given to the permit authority on requestThe schedule of maintenance approved by a building surveyor
ACTEmergencies Act 2004, s 95, and ACT Fire & Rescue guideline FSG-05NoneNo statement. The occupier holds the dutyRecords to ACT Fire & Rescue on request, within 48 hours under FSG-05AS 1851 or AS/NZS 2293.2 as in force from time to time, the standard in the building approval, or one prescribed by regulation, for appliances installed under a fire service direction (s 95). FSG-05 applies this to installed systems in Class 2 to 9 buildings
NTFire and Emergency Act 1996, s 27A, and Fire and Emergency Regulations 1996, reg 11 and Schedule 2NoneNo statement. The owner of a prescribed building holds the dutyNothing is lodged. NT Fire and Rescue Service inspects prescribed buildings and expects records within 48 hours of a request under its advisory noteRelevant standards (reg 11(6)(a)). The NTFRS advisory note names AS 1851-2012 for most measures and AS/NZS 2293.2 for emergency lighting and exit signs

Strip away the forms and the same four things matter everywhere: a list of the building's measures, a standard each measure is kept to, a record for every routine, and an owner or occupier who holds the duty even when a contractor does every hour of the work. Get those right and each state's paperwork is a summary of what you already hold.

New South Wales: the annual fire safety statement

The owner of a building with essential fire safety measures, other than a Class 1a or 10 building or a temporary structure, must give council an annual fire safety statement (s 89). Each measure must have been assessed by an accredited practitioner (fire safety), and the building inspected, within the 3 months before the statement is issued (s 88). It is due within 12 months after the last statement was given to council or, if a fire safety certificate was issued in the previous 12 months, within 12 months of that certificate, whichever is later. A copy goes with the fire safety schedule to the Fire Commissioner, and both are displayed prominently in the building. Late lodgement is a separate offence for each week it continues (s 89(3)). Critical measures flagged in the schedule need supplementary statements at the shorter intervals the schedule sets (s 91).

Each accredited practitioner signs the statement or provides a separate signed record. Under the approved form, the person who makes the owner's declaration cannot be one of those practitioners or their employer, employee or direct associate, and an agent needs the owner's prior authority.

Since 13 February 2026, inspection, testing and servicing must follow AS 1851-2012 for every activity the standard covers, unless an approved performance solution addresses it, and the AS 1851 records must be kept on site at the building for at least 7 years (s 81A). Our guides to AS 1851 in NSW and the annual fire safety statement evidence pack cover the routines and the statement in detail.

Victoria: the annual essential safety measures report

Part 15 of the Building Regulations 2018 covers Class 1b, 2, 3, 5, 6, 7, 8 and 9 buildings, Class 4 parts and places of public entertainment (reg 213). The occupancy permit lists each measure, its required performance, and the frequency and type of maintenance (reg 194). Where no occupancy permit was needed, or an order required the measure, a maintenance determination does the same job (reg 215).

The owner must make sure the report is prepared within the 28 days before each anniversary of the earlier of the first occupancy permit (or amendment to it) and the first maintenance determination that required a measure. For measures in buildings constructed before 1 July 1994, it is the 28 days before 13 June each year (reg 223). The owner signs it in the approved form, stating that all reasonable steps were taken to keep each measure operating, inspected, tested and maintained (reg 224). Nothing is lodged. Instead, within 24 hours of a request from the municipal building surveyor or the fire authority's chief officer, the owner must make available for inspection at the building the last 10 years of reports, the maintenance schedules and determinations, and the records of every inspection, test and repair. The 10 year limit applies to the reports only. The maintenance records have no end date (reg 225).

Where a permit or determination names AS 1851-2005 or an earlier edition, compliance with AS 1851-2012 counts. An owner who switches must stay on AS 1851-2012 for that measure and say so in the report (regs 196, 217 and 224). The Building and Plumbing Commission, the trading name of the Victorian Building Authority, approves the report form and publishes guidance. The council's municipal building surveyor and the fire services' chief officer can call for the records.

Queensland: the occupier statement

Queensland puts the duty on the occupier, who must maintain every prescribed fire safety installation at all times to a standard of safety and reliability in the event of fire (Fire Services Act 1990, s 146M). The Building Fire Safety Regulation 2008 sets the detail. Each installation must be maintained by an appropriately qualified person and inspected and tested at the intervals in Queensland Development Code part MP6.1 (s 54). The person who did the maintenance must give the occupier a critical defect notice in the approved form within 24 hours (s 53), and repairs the record of maintenance calls for must be done within one month unless there is a reasonable excuse (s 54(4)).

Each record of maintenance names the installation, the maintainer and their licence number, the date, the work, the result and any repair, and carries the maintainer's signed statement (s 55). The occupier prepares the occupier statement at the intervals in MP6.1, sends the Commissioner a copy within 10 business days, and keeps a copy with the records for 2 years (s 55A). The Queensland Fire Department's fire safety management tool expects a copy to reach the Commissioner each year, and it is plain about evidence: for extinguishers and hose reels, a tag, an invoice or a summary report is not an acceptable record of maintenance.

High occupancy buildings, including Class 2 and 3 buildings over 25 metres and certain workplaces normally employing 30 or more workers, also need a fire safety adviser appointed by the occupier, holding a building fire safety qualification issued within the last 3 years (s 34).

South Australia: annual verification to council

Where a schedule of essential safety provisions has been issued, the owner must not use the building unless each provision has been maintained and tested every calendar year to the relevant Ministerial building standard (reg 94). Within 60 business days after the end of each calendar year, the owner gives council the Form 3 verification, the ESP maintenance certificate, confirming the work was done and that there are no outstanding defects, or that steps are under way to fix them. Form 3 is signed by the owner or the owner's delegate and by each person who carried out the maintenance. Where more than one party maintained the building, each sends its own Form 3.

Class 1b buildings, and Class 3 to 8 and 9b buildings with a rise in storeys of no more than 2 and no more than 500 square metres of floor area, do not have to send Form 3 unless council requires it. Council can do that where the provisions were installed under a condition of approval or a performance solution, or the building has had a fire safety defect notice. Class 2, 9a and 9c buildings are never exempt. For aged care homes, which are Class 9c, the fire measures sit alongside the records Standard 4 of the Aged Care Quality Standards expects. The maintenance duty still applies, and an authorised officer can ask for written proof within 48 hours.

Western Australia: a duty with no annual statement

WA's Building Regulations 2012 set no annual statement for existing buildings. Regulation 48A requires the owner of an existing Class 2 to 9 building to make sure its safety measures, from fire integrity and egress to detection, warning systems, lifts and standby power, can still perform to the building standards that applied when each part was approved or built. No maintenance standard is named and nothing is lodged.

That does not make it lighter. The owner's own records are the only proof the measures can still perform. One practical way to show it is to run AS 1851 routines and keep their records.

Tasmania: the schedule of maintenance

Tasmania works through a schedule of maintenance. The responsible owner, which includes a body corporate and an occupier contracted to maintain the services, must have the schedule prepared and approved by a building surveyor, review it each specified period and comply with it (Building Act 2016, s 206). Maintenance means inspections, monitoring, testing, periodic servicing, minor repairs and reporting faults (Building Regulations 2016, reg 74). Records are kept for at least 10 years away from the building, with a copy on the premises (reg 76A), and must be produced to the permit authority, an authorised officer or the fire service's Chief Officer on request.

Australian Capital Territory: a proper maintenance standard

Under the Emergencies Act 2004, an occupier commits an offence if a fire appliance provided or installed under a fire service direction (s 92) is not maintained to a proper maintenance standard. That means AS 1851 or AS/NZS 2293.2 as in force from time to time, the standard approved with the building approval, or a standard prescribed by regulation (s 95(2) and (6)). An occupier who knows a fire appliance is damaged or defective and does not repair or replace it also commits an offence (s 95(3)).

ACT Fire & Rescue's guideline FSG-05 (August 2023) applies these standards to installed fire protection systems in all Class 2 to 9 buildings. It expects the fire safety schedule, logbooks and yearly condition reports within 48 hours of a request, and written notice of critical defects.

Northern Territory: prescribed buildings

The Fire and Emergency Regulations 1996 list prescribed buildings in Schedule 2. They include health care, child care, education, places of public entertainment and assembly, hotels, hostels and other shared accommodation, offices, shopping complexes, factories and warehouses, licensed entertainment venues and laboratories. The owner of a prescribed building must make sure fire alarms and other warning apparatus, exit lights, emergency lighting and firefighting equipment are maintained in accordance with relevant standards, and that AS 3745 is applied to installed safety systems (reg 11(5) and (6)).

NT Fire and Rescue Service inspects prescribed buildings regularly (Fire and Emergency Act 1996, s 27A). Its advisory note on maintenance names AS 1851-2012 for most measures and AS/NZS 2293.2 for emergency lighting and exit signs. It also expects the owner's records to be available within 48 hours of a request. Nothing is lodged each year.

Running a multi state portfolio

The routines behind all of this are close. What changes at the border is the paperwork, the person who signs it and the clock it runs on. The common failures follow from that.

The answer is the same everywhere: one record per measure, holding the standard it is kept to, built from each visit as it happens. Each state's document is then a view of the same records.

Where FMIQ Nexus helps

In FMIQ Nexus each measure can be held as an asset on its building with its routines. Visits, defects and their follow up jobs are recorded against it as the work is done, so the records behind each state's statement or report are in one place when the date comes round. FMIQ Nexus keeps the records. The owner or occupier signs, and in NSW the accredited practitioner assesses.

A short checklist

Six ticks and the annual document is a summary. Fewer, and it is a project.

See it on one building

Walk one job through the product, from the routine to the record. Or book a twenty minute demo on one of your own buildings.

Common questions

Is AS 1851 mandatory in every state?

No. NSW requires AS 1851-2012 from 13 February 2026 for the activities it covers, unless a performance solution covers them. The ACT Act names AS 1851 and AS/NZS 2293.2 for appliances installed under a fire service direction, and ACT Fire & Rescue applies them to installed systems in Class 2 to 9 buildings. The NT regulation says relevant standards, and NT Fire and Rescue Service's advisory note names AS 1851-2012. Victoria, Queensland, South Australia and Tasmania tie maintenance to the standard in the building's approval, code or schedule, and Victoria accepts AS 1851-2012 where an older edition is named. WA's regulation names no standard. A revision of AS 1851 is under way. NSW names the 2012 edition. The ACT Act and the NT advisory note follow the current edition, so a new edition would apply there once published.

What is the difference between the NSW annual fire safety statement and the Victorian AESMR?

The NSW statement is lodged with council, copied to Fire and Rescue NSW and built on an accredited practitioner's assessment of each measure. The Victorian report is signed by the owner, is not lodged, and must be available at the building within 24 hours of a request.

Who signs the annual statement?

In NSW it is issued by or on behalf of the owner, and each accredited practitioner signs it or gives a signed record. In Victoria the owner signs. In Queensland the occupier prepares it, or the owner where there is no occupier. In South Australia Form 3 is signed by the owner or their delegate and by each person who did the maintenance. WA, Tasmania, the ACT and the NT have no annual statement under their main instruments.

How long should we keep maintenance records?

NSW: AS 1851 records on site at the building for at least 7 years. Victoria: the last 10 years of annual reports, and all inspection, testing and maintenance records with no end date. Tasmania: at least 10 years away from the building, with a copy on site. Queensland: the occupier statement with the records for 2 years. Across a portfolio, keep everything to the longest rule.

Can software produce the annual statement?

Software can hold the records for each measure, from the routine visits and the defect loop, and put them in front of whoever signs. The statement, and any assessment the law requires, stays with the owner or occupier and, in NSW, the accredited practitioner.

This page is a practitioner's guide, not legal advice. It summarises the instruments named above as they stood in October 2026. Regulations change and buildings carry their own conditions. Check the current instrument and your building's approval documents, and take advice from an accredited practitioner, building surveyor or lawyer where it matters.