See it in action

One job,tracked from fault to finish.

A guided walkthrough of FMIQ Nexus using representative sample data, following one job the whole way, from the moment it is reported to the invoice that matches the work.

Fewer things slip through, response comes faster, work on site stays safer, and every cost can be defended.

Sample data · a demonstration estate
Report

It starts with
plain words.

Whoever spots it, a cleaner, a teacher, a contractor, just says it or types it, hands free if their hands are full. FMIQ helps turn that into a structured record, but it never approves, closes or signs anything off. A person's name is on every sign-off.

Speak it or type it · the AI assists, people decide
Report a job · sample data
FMIQ Nexus screen: Report a job (sample data)
Make safe

Anything unsafe,
anyone, right now.

A hazard is a photo, a place and a quick risk score in one short form. Tick one box and it becomes a make safe job, with its priority taken straight from how serious it is.

The risk score, set as it is raised
Raise a hazard · sample data
FMIQ Nexus screen: Raise a hazard (sample data)
Make safe

It lands on
the same record.

It comes through with its own reference, a severity and the job it raised, so nothing sits in an inbox waiting to be written up later.

The job linked back to the hazard
Hazard register · sample data
FMIQ Nexus screen: Hazard register (sample data)
Do the work

The job carries
its own asset.

The work order carries the pump it belongs to, its site and its make safe clock, so whoever turns up is working from facts. The record builds up as the work is done.

The asset and the make safe clock on the job
Work order · sample data
FMIQ Nexus screen: Work order (sample data)
Control the risk

High risk work waits
for a named approval.

Hot works, working at heights and confined spaces go through an approval chain that has to be completed before work starts. A contractor whose cover has lapsed is stopped before the job is ever handed over.

The approval chain, signed in order
Permit approvals · sample data
FMIQ Nexus screen: Permit approvals (sample data)
Control the risk

What is locked out,
shown as it happens.

Every live isolation shows who put it on, when, and which lock it is, so the board always reflects what is actually happening on site.

Live locks, each with a name and a time
Isolation board · sample data
FMIQ Nexus screen: Isolation board (sample data)
Close the loop

It all rolls up
to the asset.

Every asset holds its own story: what sits above and below it, what has been done to it, and what it has cost. That is what turns next year's budget into an argument you can back up.

Condition, cost and history, on the asset
Asset record · sample data
FMIQ Nexus screen: Asset record (sample data)
Close the loop

One thread
to the invoice.

From the job you raise a purchase order to the right contractor, and the money stays in view the whole way, from the first estimate to what actually gets paid.

Estimate, PO and payment, on one line
Cost and invoice · sample data
FMIQ Nexus screen: Cost and invoice (sample data)
FMIQ Nexus Report screen
FMIQ Nexus Make it safe screen
FMIQ Nexus One register screen
FMIQ Nexus The work screen
FMIQ Nexus The permit screen
FMIQ Nexus Live isolations screen
FMIQ Nexus The asset screen
FMIQ Nexus The money screen
01 / 08
When it is a P1

One request, one job,
many vendors, one record.

A serious job rarely needs one trade. The request becomes a prioritised work order, and that one job brings in the vendors it needs. Each vendor sits on its own purchase order, all linked back to the same work order and priced from a quote you accepted. It all stays one job, from the service request to the work order to the purchase orders. The timing, purchase orders and invoicing shown follow how a site is set up, not a fixed automatic path.

Illustrative sample workflow
SERVICE REQUEST · SR-2026-118 · REQUESTOR PORTAL
Major water ingress reported, main switchroom
Triaged and prioritised. Every move is kept on the request timeline. P1 CRITICAL
↓ triaged into a work order, the priority carried with it ↓
WORK ORDER · WO-MAIN-9001 · P1
Make safe, main switchroom
Asset: Main Switchboard 1 · make safe clock set when the request became a job · one job, one owner, everything hangs off it.
THE JOB PULLS IN THREE TRADES
One work order, three vendors, three purchase orders, all linked to WO-MAIN-9001. Each vendor's price came through Vendor Quotes, where the offers line up for a like-for-like comparison and anything that does not match is flagged, so a person can make the call on the same terms. Accepting one closes the rest, so nothing is priced twice.
PO-9001-01
Currawong Electrical
Isolate & make safe MSB-1 · lock K-118
Accepted quote $3,200
LINKED · WO-9001
PO-9001-02
Tanderra Plumbing
Stop the ingress, extract water
Accepted quote $1,850
LINKED · WO-9001
PO-9001-03
Harbour City Mechanical
Dry out & ventilation
Accepted quote $2,400
LINKED · WO-9001
↓ every purchase order reports up to the one work order ↓
WORK ORDER MADE SAFE · 47 MIN
The job is stood down inside its make safe target, with every trade's purchase order attached and its cost captured against WO-MAIN-9001.
PERMANENT FIX · PO-9001-04
Currawong Electrical · $14,500
The remediation is quoted and raised as a further purchase order against the same work order. QUOTE ACCEPTED
CLOSE OUT · FINANCE RECONCILED
The work order closes with every purchase order reconciled in Finance where it is connected: estimated against invoiced against paid, vendor by vendor.
HISTORY · MAIN SWITCHBOARD 1
The whole chain stays on the record: the request, the job, every vendor and purchase order, ready for the next audit or the next incident. ON THE RECORD
The Operating Picture

One job, then
the whole estate.

Every job you just followed rolls up into one live view. It scales from a single site to your whole portfolio, and each team shapes it around what they own, so it is the picture you need, not a wall of charts.

All sites Live
0
Critical · P1
0
Overdue
0
Permits live
0
Compliance current
Portfolio · by siteOpen
Central Plaza 4 open
Riverside Depot 9 open · 1 P1
Harbour Campus 2 open
North Tower 6 open · 2 P1
West Terminal 3 open
Drag in the tiles that matter, hide the ones that do not. Every role, from the field to the boardroom, keeps its own version of this. CUSTOMISABLE
Illustrative · sample estate

The same picture goes up on the wall in the ops room and into the field crew's pocket. The field app works offline first, and native iOS and Android apps are publishing to pilot users now.

Closing the loop

The work is done.
The record is not.

A job does not end when the spanner goes down. The cost, the asset's remaining life and the report all fall out of the same record, so the loop closes.

ONE CLOSED JOB · ONE RECORD Everything below branches off the same job. That is the loop.
Cost, tracked

Estimate to invoice, on every job

Every job's cost is captured, estimate through to paid invoice, and rolls up by asset, by site and by contractor.

Whole of life

Assets planned before they fail

Every asset carries its condition, its age against useful life and its running cost, so you plan replacement and capital works before things fail.

13.4 of 15 yearsnearing end of useful life
Service reports

Evidence, ready to hand over

Every visit closes with a service report and its evidence attached, ready to hand to a client or an auditor.

Service report
PDF, evidence attached, signed off
Reporting & connections

Numbers you can defend

Reporting, OH&S and cost run natively in the platform, filtered to a site, a client or a period. Where you already run your own reporting, safety or finance systems, they can connect through APIs, subject to integration, so the platform fits your stack rather than replacing it.

Australian hosted
Primary data is hosted in Sydney. Overseas providers some features use are listed on our privacy page.
Full audit trail
Every change carries who did it, what changed and when.
Open APIs
Sits alongside your reporting, safety and finance systems.
Start on one site
A pilot first, then grow across the estate at your pace.

Put us to work

Show us your hardest site.
We will take it from there.

That was one job on sample data, start to finish. Bring us a real site of yours and we will run the same on your own estate: a live fault turning into a connected record, from the first report through to a cost you can defend.