CMMS software in Australia: what to look for

Most CMMS buying guides are written by vendors for a global audience. They count features. This one is written by someone who ran Australian estates for twenty three years, and it starts from a different place: what has to be true for the system to survive an audit, a contractor with lapsed insurance, and a Friday afternoon quote.

By Arbab Shah, asset and facilities manager. A practitioner's guide, not legal advice, reflecting the instruments as at October 2026. Check regulatory specifics against the current instrument for your state before you rely on them.

Start with the job, not the feature list

Take one real job from your estate. A leaking tap, a tripped chiller, a cracked tile. Trace it from the person who noticed it to the invoice being paid. Count the systems it touched and the number of times someone retyped the same fact.

That trace is the test. A CMMS worth buying carries that whole thread on one record: the report, the job, the permit if it needed one, the evidence the work was done, the quote and the money. If any of those live somewhere else, you are buying a work order app and keeping your spreadsheets.

The statutory spine is not optional in Australia

An overseas work order app can be excellent and still know nothing about the routines Australian buildings are held to. Check these against your own portfolio:

The question for any vendor is simple. Does the regime raise its own inspections, with the evidence attached to each visit, and a defect loop from finding to fix to retest? Or does someone build the schedule by hand and hope?

Contractors: the gate is the feature

Every facilities manager has a story about the contractor whose insurance had lapsed three weeks before the ladder went up. The story ends well or it does not.

A CMMS built for Australian conditions holds the contractor's insurance, licences and inductions with their expiry dates, and stops the contractor accepting a job when any of them has expired. The gate has to be automatic. A reminder email is not a control.

Ask the vendor to show the gate stopping a job, live, in their demo.

Safe work has to travel with the job

Permits to work, isolations and safe work method statements are the paperwork that protects the person doing the work. If they live in a binder or a separate app, they detach from the job the moment things get busy.

Look for live permits with named approvers, isolations visible on one board, and a rule that nothing marked unsafe can start. Under the Work Health and Safety Act, officers have a personal due diligence duty under section 27, and a live permit board is the fastest evidence that the controls actually run.

Money is part of maintenance

A quote for a compressor should face three questions before anyone approves it. Is the unit under warranty? Has the same fault been repaired recently? How much life does the asset have left on the plan?

Most systems keep those answers in three places the approver never opens. A CMMS that puts them on the same screen as the approve button changes decisions, and a purchase order and invoice matching chain that books every dollar back to the asset means next year's budget is built from real history rather than last year's guess.

The field test

Take the vendor's phone app into your worst plant room. No signal, gloves on. Log a job, attach a photo, close it, walk out. Two things should be true: nothing is lost or silently overwritten, and the job visibly changes state when the sync really happens. A green tick before the save is a bug you will pay for later.

Hosting and the questions procurement will ask

Health, education and government buyers in Australia ask where the data is hosted, who can sign in and how, and whether every change keeps its author and time. Get those answers in writing. Australian hosting matters for more than sovereignty, it also decides whose support hours you get.

A short checklist to take into demos

  1. Trace one job end to end on one record.
  2. Watch a statutory regime raise its own inspection and attach evidence.
  3. Watch the contractor gate stop a job.
  4. Open a live permit board.
  5. See a quote face warranty, history and remaining life.
  6. Close a job offline and watch it arrive.
  7. Get hosting, sign in and audit trail answers in writing.

If a system passes all seven, the feature count will take care of itself.

See it on one job

FMIQ Nexus was built to pass that checklist, by a practitioner who used to run the trace by hand. Walk one job through the product itself, or book a twenty minute demo on one of your own buildings.

Common questions

What is the difference between a CMMS and a work order app?

A work order app raises and closes jobs. A CMMS carries the whole thread: the statutory routines that raise work on their own, the permits and contractor gates that keep it safe, the evidence, and the money chain from quote to matched invoice.

Does an Australian facilities team need a CMMS that knows AS 1851?

If the portfolio includes buildings with fire safety measures, yes. The routines and the annual evidence are defined by the standard, and a system that does not model them leaves the compilation to a person every year.

How long does it take to get started?

One site or forty, an estate can be working in live data within a fortnight when the existing registers come across as they are and get tidied as the work runs.